NORTH RICHMOND — CALIFORNIA58 LOCAL. NORTH RICHMOND — Contra Costa County's Active Transportation Plan identifies the North Richmond Neighborhood Network as a proposed 1.6-mile complete-streets improvement connecting local schools, recreation and neighborhood destinations.
Background and community impact
The plan focuses on Giaramita Street, Market Avenue and Chesley Avenue, with proposed traffic calming, more continuous sidewalks, safer pedestrian crossings and bicycle access between Verde K–8 School and Shields-Reid Park Community Center.
The county plan estimated $8.5 million in construction costs plus $2.1 million in development and planning costs, for a total preliminary estimate of $10.6 million. These are planning-level figures, not proof that a construction contract has been awarded.
Students and families using the corridor can provide feedback on the most hazardous crossings and difficult sidewalk gaps. Addressing those issues can be especially important for people walking to school and after-school programs.
Residents should use the county project documents and subsequent budget and design updates to distinguish proposed improvements from completed infrastructure.
Primary source: Contra Costa County official project information. Check the county's updates for future approvals, construction and changes.
Support North Richmond News
Choose how to support North Richmond News:
Credit / Debit Card via StripeChoose your contribution amount on the secure California58 Stripe checkout. One-time support for independent local journalism.
Continue with PayPal Continue with ZelleZelle payments go to Vitaly Ataev Troshin. Please verify the recipient in your bank before sending. Availability depends on your bank.
Optional reader support. When possible, add “North Richmond News” to the payment note. Contributions are not advertised as tax-deductible. Support does not influence editorial decisions.More from North Richmond News
- North Richmond Warehouse Proposal Would Add Two Buildings on 29-Acre Site →
- North Richmond's 1.7-Mile Urban Nature Loop Connects School, Park and Local History →
- North Richmond's $4 Million Wildcat Creek Fish Passage Work Scheduled Through November 30 →
- North Richmond’s Lower Wildcat Creek Restoration: $5 Million Plan Targets 5,000 Feet of Sediment and Flood Risk →
СООБЩЕСТВО
Комментарии
Присоединяйтесь к обсуждению California58. Чтобы комментировать, необходимо войти в аккаунт.
Создайте бесплатный аккаунт California58 или войдите через доступную социальную сеть.